Skip to content

Data

MySQL

Widely deployed relational store we run and migrate from.

Layer

Data

Used in

All services

Same layer

6 technologies

How we use MySQL

We operate MySQL where it is already entrenched and plan migrations when Postgres is the target.

Where we reach for it

  • Running existing systems

    Operating, tuning and securing MySQL databases behind CMSs, shops and custom apps that have used it for years.

  • PHP application stacks

    Laravel, Symfony and CakePHP apps where MySQL is the established, well-understood default.

  • Query and index tuning

    Slow-query analysis, index design and schema clean-up on databases that grew without a plan.

  • Migration planning

    Preparing a move to PostgreSQL or a newer MySQL version, with schema mapping and rehearsed cut-overs.

When we pick something else

For a new product with no MySQL constraint we pick PostgreSQL for its stricter behaviour and richer features. If a self-hosted, MySQL-compatible engine is wanted, MariaDB is the alternative to compare.

What we watch for

  • Character sets

    Mixed latin1 and utf8 columns cause garbled umlauts and broken emoji. Use utf8mb4 consistently and check what the legacy data really contains.

  • Replication and backups

    Replicas are not backups. We keep point-in-time recovery with binary logs and test restores.

  • Strict mode and versions

    Older configs run in lax SQL modes that silently truncate data. Upgrades can surface this, so we test before switching.

Common questions

Is MySQL still a good choice?

Yes, for systems built around it and for workloads it handles well. For new projects without constraints, we usually prefer PostgreSQL.

MySQL or MariaDB?

They share a common origin and are mostly compatible, but diverge in newer features and tooling. We follow what your hosting, framework and existing data already use.

Can you speed up our slow MySQL database?

Often yes. We start with slow-query logs and execution plans, then fix indexes, queries and schema before looking at bigger hardware.

Next step

What is costing you time, money or customers today?

You get an honest assessment of whether and how we can help, followed by a written plan with a cost estimate and timeline.

Tell us what you're building

We reply within 1–3 working days, by email, call or video. Your choice.